You’re going to build a what???

The saga of J building his tiny off-grid house

Archive for May, 2009

Quick update.

with 3 comments

Not much happening of late, work’s busy as is the rest of life. Weekends are solidly booked over the next month or two with little work being done on the project. However, the wombling has offered up a couple of new items. One is some cork floor tiles which should be enough to do the kitchen and bathroom area and give a warm feel underfoot, plus some old floorboards which I’ll plane down and might be enough to do the living area. I also have a pack of wooden parquet floor tiles which should be enough to go under the area where the woodburner will be and make clean up a bit easier. That should be all the flooring apart from the loft.

I also should be picking up a solar hot water panel I’ve been offered by a member of an alternative energy forum I’m on. I’m not going to plumb this in directly to the house, as that would need a pump and storage cylinder and would have to go on the roof making plumbing more complex. Instead I’m going to connect a water tank to the top of the panel and run it as a thermosyphon system on a frame outside. I can then just run a couple of pipes to valves in the side of the house which connect it to the water system. The plan is that when it’s warm enough I just turn the valves and the water enters the system before the gas water heater, preheating it and reducing gas usage. In the summer I may not need to use the gas at all. When it’s cold and not getting much sun I can just close the valves and isolate it. We’ll see how that works when I have it and can test it.

Hoping to get over and do some work on the trailer on Monday. Have decided not to go away as planned in July and take the week to work solidly on the house. If I can get the trailer sorted before then I might be able to get the walls and even the roof framing done with a little help and some good weather. Can’t wait to start on that, it’s when it really begins to look like a house.

Cheers,

J.

Written by J

May 29th, 2009 at 2:41 pm

Quick update.

without comments

I’ve been playing with some notification options and you can now subscribe to updates of this blog via RSS, Twitter and email by clicking on the links in the sidebar or entering your address in the email subscription box. I’m as paranoid as anyone about online privacy and I promise not to give away, sell or otherwise disseminate your address to anyone.

J.

Written by J

May 18th, 2009 at 11:14 am

Posted in Uncategorized

Two steps forward, one step back.

with 6 comments

It’s been a very busy couple of weeks here, but there’s less progress than I’d hoped there would be. Let’s start with the good news, my Ebay-fu is still rocking. The recent purchases are as follows:

Shower door: £10.50

I nipped up to oxford to collect this last week, only took 45 mins to get there and also allowed me to drop in on some friends who lived nearby for a quick cuppa and a chance to catch up. The door just needs a clean and the frame just needs the silicon sealant removing and it’ll be perfect.

Chimney Flue: £228

Now this comprises of 6 sections of double-walled, insulated, stainless-steel flue, plus the cap and a couple of 45degree bends. Each section is about a meter long and in the shops would cost around £100 each, so that’s £700-worth of flue. Found a courier company to pick them up from Kendal and bring them down to London for £30. Bargain. Just need a bit of a polish and they’ll be as good as new.

chimney-pipes

Kitchen Sink: £26

Another Ebay bargain, this is a Kohler sink, brand new, still in it’s box and which retails for £285. I was actually bidding on another, identical looking, sink but which in actual fact was smaller. That went beyond my set budget (£30) so I started bidding on, and ultimately won, this one. It wasn’t till I picked it up that I realised it was a chunk bigger, as the seller had used the same photo for both and just changed the size in the description. Still, although it’s a bit bigger than planned, it’s a really solid sink for an absolute steal and, in emergencies, I can use it as a bath.

kitchen-sink

Construction was planned for a bit of a boost this week as I took delivery of a mig welder to repair the trailer. Once again bought from Ebay for the bargain price of £136. It’s a bit rough around the edges and, when we plugged it in, it decided not to feed wire out. Opening it up and blasting away years of dust and assorted crud with the air blaster and winding off the first couple of layers of rusty wire soon had it running smoothly.

welder1

welder2

We spent a morning chasing around to find some gas for it, turns out you need an account with BOC to buy gas, as you have to rent the bottles from them and that’s about £60/year plus the cost of the gas. Found a place that does it’s own bottles and for £103 picked up a big bottle of Argoshield gas, got three years rental on the bottle included and can swap out for gas at £20 a fill for the next 3 years any time I want. Nice.

It’s a big beast of a welder and you can’t run it at full power off a 13A plug but it seemed to be fine at lower power so my brother Nicky sat me down and taught me the basics of welding. I had some offcuts of steel from the trailer sides that we’d removed so we cleaned a couple of those up and got stuck in. It’s fun, I’m going ot enjoy doing more of that and you can see my efforts below. Need some more practice, but I think they’ll hold things together.

first_welds

The next morning we were up bright and early to go and collect the steel pieces we’d ordered and then set up to cut out the bad sections and weld in the new. That’s when we discovered that the power was out to the garage where I’m running my extension from. There was no-one home to ask if we could check the breakers so that was that for the day. Nick had to leave at lunchtime so we decided to leave everything as it was. I’ve got plenty to be getting along with in the meantime such as practicing my welding, fixing some other bits of the trailer etc.I’m considering picking up a small generator off ebay (wherelse) so that I can guarantee having power in future.

We did measure everything out properly so that now I know exactly how big the house is going to be, where I’m running the framing out to and how wide I’m going to extend the house out to (just a little bit less than the wheel widths. I can now sit down and properly plan the framing. I may even start building some of the framing as individual panels, getting them nice and square and cladding them in OSB, this means I can effectively pre-fab them, store them and then put them up once the trailer’s done, it also means they’ll be straight, true and, hopefully, will go together quickly and without gaps.

Meanwhile, Nick has managed to sort a new job out this week and will be moving to Sheffield in a couple of week’s time. This means that instead of being in Ireland, he’s a couple of hours up the motorway and can come back down soon to oversee the cutting out of the trailer parts and do the main structural welding for me, something that makes me a lot happier about the longevity of my tiny house being towed around the place.

In hindsight, I should have bought a better, more expensive trailer. This has set back the building several weeks and added to the cost, something I could well do without. That said, I’m learning new skills and collecting new tools. I may sell the welder when it’s all finished to recoup some cost, or I may keep it and add it to my workshop. I said originally that this wasn’t about the end product, it wasn’t about building with the absolute minimum cost, it was much more about the ethos of building small, about learning new skills and the journey of actually building my own house. Some of these things are priceless, such as sitting with my brother and learning a new skill from him. I wouldn’t change a thing about what I’ve done so far.

Peace, out.

Written by J

May 16th, 2009 at 1:33 pm

Now we’re seeing progress!

with 2 comments

It’s been a busy week on the tiny house project and there’s finally some visible progress being made. This is how the trailer looked before we started:

the-beginning

After a couple of days work, it now looks like this:

trailer-after
The boards are all off, it’s up on blocks, it’s been leveled so that there’s a plumb base to work from, the wheels are off, and most of the extraneous metal has  been removed. There’s certainly more work to be done on it, and it’s going to be a busy couple of weeks getting everything done that needs doing.

Brakes: No idea how these used to work, from what we could make out amongst the twisted metal rods, there’s no way they could have worked correctly. We’ve taken it all apart and sat and played with the bits and have a reasonable idea of how it should go together properly. I need to replace one of the brake rods and bend on of the brackets into shape. I think one bracket will need replacing as the pivot rod is too loose for it to pivot rather than swing. Given the weight of the final house, I’m paying rather close attention to getting the brakes working properly as the last thing I’d want when towing is to see the house overtaking me. The wheel hubs look reasonable although I’m going to strip them down and check the bearings, repack with grease, etc. There’s also 3 different sized tires amongst the 4 wheels, so they’re going to need to be replaced. I’ll probably just find a local scrap yard and pick up 4 new wheels and tires so that they all match properly. I imagine there’ll be new brake pads going in there too.

Suspension: I couldn’t find any makers information on the axle/suspension units. They look similar to Indespension ones, but there’s nothing to confirm what load they take. Need to do a bit of googling on this and find out more.

Frame. In general, the trailer frame’s in good shape. The main frame is box section steel, with heavy angle reinforcing members below. There are a couple of sections that have rusted where additional pieces have been added later, and it appears as though they’ve just been points where water has pooled and it’s rusted.This is the worst bit, there’s only a one this bad and a couple of small patches elsewhere.

rust

Those will need to be cut out and new sections put in their place. I may also replace the front draw bar as there’s some rust where the wheel dolly was welded on badly. Nothing too serious so I’m going to hunt up some new steel stock and replace any sections that need it. My brother’s coming over in a couple of weeks and will weld it up properly while also teaching me how to do basic welding so I can weld together the folding porch, I just need to find a 180amp or so mig welder on ebay. Before then I need to sand down and paint the good bits of the frame, for which I’ve bought some rust treatment/undercoat paint, and will then top coat with hammerite.

Benjy came over, armed with his angle grinder (mine having gone missing somwehere) and we had a fun afternoon of removing excess metal from the trailer, consisting of the frame around the edge ( I need the trailer flat to be able to build the subfloor ) and the winch/winch mount from when the trailer was used for shifting cars and farm machinery in it’s former life.

bengrind1

There’s a bit of grinding to do so that the stubs are flat with the frame and some other small bits will need removing but those can wait until Nick comes over for the welding and I can pick his brain on how best to do them. I’ll put some more photos up next week as it’s often hard to describe what we’re doing or how lovely my workspace is, as you can see from John trying to explain what he’s been up to this week.

john1

28 years we’ve known each other and it doesn’t take much of a harebrained idea to get us together in the sunshine playing with tools and implements of destruction. The weather was supposed to be bad all week but apart from a passing shower on one day we’ve been really lucky and it’s been fine, warm and sunny all week. It’s officially summer now, so here’s hoping the next few months continue in the same vein.

Cheers.

Written by J